Site Screening for Solar, Wind & Battery Storage

Screen candidate land for renewable energy projects — landscape designations, ecology constraints, agricultural land grade and infrastructure, all on one map.

What Maplify Offers Renewable Energy Developers

Solar, onshore wind and battery storage schemes each carry their own site-selection constraints — landscape sensitivity, ecology designations, agricultural land grade and grid proximity chief among them. Maplify brings these datasets together on one map so developers can screen a shortlist of candidate sites quickly, before committing budget to detailed technical studies.

Search or draw a boundary around a candidate parcel and instantly see Green Belt, AONB / National Landscapes, National Parks, SSSI, SAC/SPA/Ramsar sites, ancient woodland, agricultural land classification and heritage designations overlaid together.

Why It Matters

Renewable energy planning applications attract close scrutiny of landscape and ecological impact, and local planning policy frequently discourages development on the best agricultural land. Screening these factors before a site is shortlisted reduces the risk of a scheme being refused late in the process, after significant development costs have already been incurred.

For developers managing a pipeline of prospective sites across multiple regions, a consistent, fast screening process helps prioritise the sites most likely to secure planning consent.

Traditional Site Screening vs Maplify

TaskTraditional MethodWith Maplify
Check landscape designationsCross-reference Natural England and local authority landscape character maps separatelyInstant overlay on the interactive map
Check agricultural land classificationRequest ALC data or commission a soil surveyALC grade layer built into the map
Check ecology designationsSearch multiple statutory and non-statutory ecology datasetsSSSI, SAC/SPA, ancient woodland shown together
Screen multiple candidate sitesRepeat manual research per site, often taking days eachScreen a shortlist in the same session

How to Screen a Renewable Energy Site

  1. 1

    Draw or search the boundary of a candidate site.

  2. 2

    Switch on landscape, ecology and Green Belt layers to check designations.

  3. 3

    Check agricultural land classification to assess policy sensitivity.

  4. 4

    Review nearby infrastructure and access considerations.

  5. 5

    Export a feasibility report to share with your planning and environmental consultants.

This is general guidance, not professional or legal advice — confirm specifics with the relevant authority or a qualified professional.

What's Included

Landscape & ecology layers
AONB, National Parks, SSSI, SAC/SPA/Ramsar, ancient woodland, priority habitats.
Agricultural land classification
ALC grade mapping to assess Best and Most Versatile land sensitivity.
Planning designations
Green Belt, heritage and conservation area layers.
Reporting
Site feasibility reports and A3 block plan exports.

Important Limitations

  • Maplify is a desktop screening tool — it does not replace formal ecology surveys, landscape and visual impact assessments or grid connection studies.
  • Constraint data reflects currently published designations and should be verified with the relevant authority before submission.
  • Grid capacity and connection costs are not shown and must be confirmed with the relevant network operator.

Common Use Cases

Solar Developers

Screen land for ground-mounted solar, avoiding high-grade agricultural land and landscape-sensitive areas.

Onshore Wind Developers

Check landscape and heritage sensitivity before progressing a site.

Battery Storage Developers

Assess Green Belt and flood risk constraints for BESS sites near substations.

Land Agents

Pre-screen client land for renewable energy development potential.

Related Use Cases

Maplify supports land and constraints screening across every sector.

Frequently Asked Questions

How do renewable energy developers use Maplify to find sites?

Developers screen candidate land parcels for solar farms, wind turbines and battery storage sites by checking landscape designations, ecology constraints, agricultural land classification and proximity to grid infrastructure — all on one interactive map.

Can Maplify show agricultural land classification for solar farm sites?

Yes. Agricultural Land Classification (ALC) grades are available as a layer, helping developers avoid Best and Most Versatile (BMV) land where policy discourages solar development.

Does Maplify show landscape and ecology designations relevant to renewable projects?

Yes. AONB / National Landscapes, National Parks, SSSI, SAC/SPA/Ramsar sites, ancient woodland and priority habitats are all included as layers, alongside Green Belt and heritage designations.

Can I check grid and transport infrastructure near a proposed site?

Yes. Transport and infrastructure layers help assess practical access and proximity considerations during early-stage site screening.

Is Maplify a substitute for an Environmental Impact Assessment?

No. Maplify is a desktop screening tool for early-stage site selection. Formal EIA, ecology surveys and grid connection studies are still required as a scheme progresses.